Manufacturing Process

Manufacturing Process

Manufacturing Process

Our manufacturing process is specialized and optimized for Nickel alloys from melting to final products with a highly quality control system. High performance and highly reliable special metals such as shape memory alloys, electric resistance materials, thermocouple materials and heat-resistant materials for existing applications and new product developments are available. We can provide tailor-made products with fine-tuned support for your needs.

Melting & Casting

High Frequency Vacuum  Induction Melting & Casting Furnace

High Frequency Vacuum Induction Melting & Casting Furnace

Molten at casting

Molten at casting

Hot rolling

The ingot is pre-heated and rolled down by hot reverse rolling and following hot tandem rolling.

Pre- heating furnace before hot rolling

Pre- heating furnace before hot rolling

Hot reverse rolling

Hot reverse rolling

Cold work ( cold drawing or rolling)

Cold drawing or cold rolling is performed, and then appropriately annealed to remove working strain.

Cold drawing

Cold drawing

Continuous annealing furnace (RA: Running Annealing)

Continuous annealing furnace (RA: Running Annealing)

Other process

Spring forming and centerless ground process are by outsourcing.

Ni-Ti spring

Ni-Ti spring

Ni-Ti tube after centerless grinding

Ni-Ti tube after centerless grinding

Inspection

All products are strictly inspected according customer’s specification and international standards etc.

 Differential Scanning Calorimetry (DSC)

Differential Scanning Calorimetry (DSC)

Bending Free Recovery (BFR) testing machine

Bending Free Recovery (BFR) testing machine

Digital Microscope

Digital Microscope

Tensile Testing Machine

Tensile Testing Machine

Packing & Shipping

The products are packed with sufficient cushions to protect from shocks during transportation, then shipped domestically or to all around the world.

Cut-wire inspection

Cut-wire inspection

Shipping yard

Shipping yard

For those who want a sample

RR service

Just size for prototype device. In principle, it will be shipped within 3 weeks after receiving an order.
* There are limited conditions. Please check the detail in flyer.

Web stock service

Ni-Ti tube web stock list
Stock list updated weekly. In principle, it will be shipped within 2 weeks.